Tuesday, March 18, 2014
job visit
My mentor and I met on Monday 3/17. We decided to visit the job site on Friday located at Stanford University on 267 campus drive . It is a research animal facility which requires retrofitting to bring it online with todays standards. We will walk the site on discuss the logistics of this remodel. It requires relocation of the research animals first. We will observe how the animals are moved to the temporary location. After that we will look at the HVAC systems that need to be demolished. This includes ductwork, chilled water, boilers cooling towers,etc.We will then check the logistics of the new installation of these systems. We will measure the equipment versus the buildings openings and crane access for fitment.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment