On march 21st we made our first visit to the job site at Stanford university. My mentor Tommy and I inspected the installation of the existing HVAC system. This picture shows the HVAC duct work above the chilled and heating hot water lines. The duct work with the chilled and heating water lines was demolished. After that process they were put into the dumpster for recycling. They will be recycled at the local garbage company, Allied Waste Services.
We then continued to tour the site. we observed the new HVAC system installation taking place. This picture indicates the installation of a plenum wall system. the two men are working on the roof. The walls are 80% complete.