This pipe is in the preliminary stages of fabrication. It is cut and sized and then will be welded. It will be used to tie in the pumps.
This is a pump that will move the chilled water. It is mounted on a inertia base that is filled with concrete. The attachment has been calculated due to seismic activity in California.
Here shown is the heart of the chill water system. It has tanks, heat exchanges and pumps. They all work together to provide chilled water. Within the next three weeks this will all be online to provide a more energy and cost effective system for Stanford. GO GREEN.
No comments:
Post a Comment